McCarthy & Stone
Aylesbury
RetirementĀ Flats
LNG Drylining, successfully concluded drylining operations near Tesco Tring Road in Aylesbury. This project was executed for McCarthy&Stone, focusing on the development of retirement flats. The drylining scope predominantly encompassed the installation of metal framing, insulation, and plasterboard.
Our team meticulously executed the drylining process, commencing with the installation of sturdy metal framing to provide structural integrity and support. High-quality insulation materials were then carefully fitted to enhance energy efficiency and maintain optimal indoor comfort levels for residents. Subsequently, premium-grade plasterboard was expertly installed, ensuring seamless wall and ceiling surfaces throughout the retirement flats.



Attention to detail was paramount throughout the project, with our skilled craftsmen employing industry-best practices and techniques to achieve flawless results. The drylining work not only met but exceeded the stringent quality standards set by both LNG Drylining and McCarthy&Stone.
LNG Drylining carried out the following drylining work at Hounsome Fields
Insulation Work
Our drylining work included the meticulous installation of insulation on both the walls and ceilings of the houses. By using high-quality insulation materials and adhering to best practices, we aimed to enhance the thermal performance of the buildings, thereby reducing heat loss and minimizing energy consumption.
Installation of Plasterboard
The drylining work included the installation of plasterboard on the walls and ceilings of the houses.
Material Loading
Furthermore, as part of our comprehensive service, we also managed the loading of materials onto the houses, ensuring efficient logistics and timely completion of the project. Our experienced team meticulously planned and executed each step of the drylining process, adhering to project timelines and safety protocols.